How much does kitchen remodel cost in Fillmore?

ZIP 62032 · Fayette County · Southern Illinois · Data updated May 2026

Fillmore is genuinely affordable for kitchen remodel. It's one of the better markets in the country to get this done.

It's also a strong investment in Fillmore. Homeowners here get solid equity back at resale, making this one of the easier projects to justify financially.

Local Cost Estimate

$23,833 - $32,244

-5% seasonal adjustment (Normal season) · Base: $25,087 - $33,941

Fillmore is 4% above the $27,000 national average

Strong ROI

Equity Gain

$29,868

Added at resale

+20.3% of home value

Normal Season ~3.5 wk lead time
All projects in Fillmore →

Good time to move forward

Strong ROI and steady market conditions. Timing is solid.

National average
$27,000
Local cost index
0.79×
Illinois median
ROI score
100/100
Lead time
~3.5 weeks
Normal

Built from Zillow ZHVI home values, BLS construction wages (May 2024), Cost vs. Value 2026 benchmarks, and US Census housing data · how this estimate is made

How We Calculate Fillmore Kitchen Remodel Cost Estimates

National average $27,000
Local base, Fillmore (0.79× index) $29,514
Normal season adjustment ( -5%) $28,038
Low: $23,833 Mid: $28,038 High: $32,244

What's driving the cost

Labor

$19,915

55% of total

Materials

$9,599

45% of total

Construction labor in Fayette County is 34% above the US median (BLS OEWS, May 2024).

Over 20 years: approx. $1,402/yr

Best Time to Book Kitchen Remodel in Fillmore, Illinois ( November 2026)

Normal Season
Current month Peak High Normal Low / Off-season

Lead time now

~3.5

weeks

Season adjustment

-5%

vs annual avg

November is a normal-demand month for kitchen remodel in this climate. Lead times are around 3.5 weeks. No meaningful seasonal premium or discount right now.

Estimate impact: Base $25,087 - $33,941 → $23,833 - $32,244

Kitchen Remodel Cost by ZIP Code in Fayette County, Illinois

Same project scope. Costs vary by ZIP based on local labor markets and home values.

Kitchen Remodel Costs in Southern Illinois, Illinois

Southern Illinois, including the Carbondale and Metro East (St. Louis suburbs) areas, has the lowest construction labor costs in the state, making remodeling projects more affordable.

Kitchen Remodel in this region

Kitchen remodel costs in southern Illinois are the lowest in the state, driven by the region's favorable labor rates. The Metro East area (Belleville, O'Fallon, Edwardsville) offers the strongest resale market for kitchen investment, with St. Louis suburban buyers who prioritize updated kitchens. Rural southern counties see lower absolute returns but also proportionally lower project costs.

Kitchen Remodel: Scope, Decisions & Permit Requirements in Illinois

Scope of work

A minor kitchen remodel (the highest-ROI version) replaces cabinet doors and drawer fronts, countertops, appliances, sink, faucet, flooring, and lighting without moving walls or plumbing. A major remodel adds full cabinet replacement, layout changes, and potentially opening walls to adjacent rooms. In Illinois, where homeowners spend more time indoors during long winters, kitchen usability upgrades tend to have strong buyer appeal. Open layouts and improved storage show particularly well in colder-climate markets.

Key decisions

Cabinet quality drives cost more than anything else. Stock cabinets are most affordable with 2-3 week lead times. Semi-custom adds flexibility. Custom adds 6-10 weeks and a significant cost premium. Quartz dominates mid-range remodels for durability and low maintenance. Granite offers a premium look at a similar price. In Fillmore's market, a well-executed minor remodel with stock or semi-custom cabinets and quartz countertops hits the sweet spot for resale return. Overspending on premium custom cabinets rarely pays back at this price tier.

Timing & permits

Minor remodels take 2-4 weeks. Major remodels run 6-12 weeks. Permits are required if you move plumbing, electrical panels, or load-bearing walls. Plan for a temporary kitchen setup during construction. In Illinois, winter scheduling for kitchen remodels is actually a good strategy. Contractor availability improves in January-March, and there's no outdoor work competing for labor or your schedule.

Complete guide

Everything you need to know about kitchen remodel: materials, hiring, red flags, and what to expect.

How We Calculate Fillmore Kitchen Remodel Cost Estimates

Step 1

National benchmark

We start with the national average cost for kitchen remodel from the Remodeling Magazine Cost vs. Value report. Base cost: $27,000.

Step 2

Local cost index

We apply a ZIP-level cost multiplier. Labor is derived from BLS construction wage data by metro area; materials from Zillow home value data. Fillmore's effective multiplier is 0.79× the Illinois median.

Step 3

Regional ROI

The Cost vs. Value report shows that kitchen remodel recoups 101% of its cost at resale in this US Census region. That's an equity gain of $29,868, not counting seasonal adjustment.

Step 4

Seasonal adjustment

November is normal season for kitchen remodel in cold-climate markets. Demand is running -5% vs. the annual average. Base $25,087 - $33,941 → $23,833 - $32,244.

Base estimate

$25,087 - $33,941

Normal season

$23,833 - $32,244

All estimates carry a ±15% range to reflect real-world contractor variance in labor, materials, and project scope. Always get 2-3 quotes before committing.

Is a kitchen remodel worth it in Fillmore?

Strong ROI

With an ROI score of 100/100, a kitchen remodel in Fillmore recoups an estimated $29,868 at resale. It's a real improvement to how the house looks and feels, and that shows up in the sale price.

You invest

$28,038

Recouped at resale

$29,868

Cost per year

$1,402

over 20 yrs

Finding Kitchen Remodel contractors in Fillmore

When you're getting quotes in the 62032 area, expect labor rates to reflect the 0.79× local cost index. Labor rates in Fillmore are on the competitive side for Illinois. Always verify your contractor is licensed to work in Fayette County and ask whether your project scope requires local building permits.

Median home value in Fillmore: $147,420. This project adds 20.3% to your home's value.

More cost estimates for 62032

Frequently Asked Questions

How much does a kitchen remodel cost in Fillmore, IL?

Based on 2026 data, a kitchen remodel in Fillmore (62032) currently runs $23,833 - $32,244, which includes a -5% seasonal factor for November (Normal season). Without that, the base range is $25,087 - $33,941. That's using a 0.79× local cost index applied to the national benchmark from the Remodeling Magazine Cost vs. Value report.

Is a kitchen remodel worth it in Fillmore?

With an ROI score of 100/100, a kitchen remodel in Fillmore is expected to add about $29,868 back at resale. A lot of that depends on Fayette County's local market, where median home values sit at $147,420.

How do Fillmore remodeling costs compare to the rest of Illinois?

Fillmore remodeling costs are running at 79% of the Illinois state median. Local home values of $147,420 are the main driver. Higher home values generally track with higher local wages and material costs.

What's the difference between a minor and major kitchen remodel for ROI?

A minor kitchen remodel (cabinet fronts, countertops, appliances, sink, faucet, and flooring without moving walls or plumbing) recoups roughly 96% at resale nationally. A major gut remodel with full layout changes recoups around 38-50%. For most homeowners in Fillmore, a well-executed minor remodel delivers better return than a full overhaul.

How long does a kitchen remodel take in Fillmore?

A minor kitchen remodel takes 2-4 weeks. A major remodel with full cabinet replacement and layout changes typically runs 6-12 weeks, depending on cabinet lead times and permit processing in Fayette County. Custom cabinets add 6-10 weeks of lead time before work even starts.

How much should I spend on a kitchen remodel for the best ROI in Fillmore?

In Fillmore's market, overspending on a kitchen remodel is a real risk. With a median home value of $147,420, there's a ceiling on what buyers will pay. A well-executed minor remodel (updated cabinet fronts, new countertops, new appliances) hits the ROI sweet spot. Full gut renovations with custom cabinets rarely pencil out here.

What permits does a kitchen remodel require in Fayette County?

In Fayette County, permits are required if you move plumbing supply or drain lines, relocate electrical panels or add circuits, or modify load-bearing walls. Cosmetic work (new countertops, cabinet refacing, appliance swaps, flooring) typically doesn't need a permit. Your contractor should clarify the permit scope upfront. Unpermitted plumbing or electrical work can delay or kill a home sale.

You have the numbers. Now get the quotes.

Most homeowners go into contractor conversations blind. You know what kitchen remodel should cost in Fillmore, what drives the price, and whether now is a good time to move. Use that.

Compare all projects in Fillmore →